Go Green Cold Mix Colored Asphalt

Construction Instruction:

Step one:
 Preparation
1. The product construction temperate should be above 0℃, recommend to construct above 5 ℃
2. Clean the Debris of the road. The surface should be free of ice, standing water, snow,
and loose material.
 
Step two:
Paving 0.7-1.5cm thickness by standard asphalt paver.
 
Step Three:
Compact the surface as soon as possible, after 1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.
 
Step Four:
 Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6 hours.
  

» Back

Cold Asphalt Website
Home | Cold Mix Asphalt | Driveway Maintenance | Terms | Privacy Policy | Trademark | GOOGLE+ | Sitemap | Package
Video Center | Technical Info | Become a Producer | News | Locate Distributors
Copyright © 2005 - 2013 Go Green Industrial (Shanghai) Co.,Ltd. All Rights Reserved.